This Habitat for Humanity SF project involved the construction of three brand-new, multifamily buildings with eight total units. 糖心logo入口 worked with subcontractors and volunteers to provide daily construction operation services for the demolition of existing structures as well grading of the entire site were required to accommodate the new buildings. The complete vertical build necessitated the installation of a storm drain system, retaining walls, utility work, electrical, solar, plumbing, fire sprinkler, mechanical, concrete, structural formwork and steel. The installation of interior finishes included quartz countertops, casement windows, fire rated entry doors, vinyl flooring, cabinets, bathroom and electrical fixtures. Exterior finishes included pavers, siding, a roof, staircase, three-story multi-tiered decks, sidewalks, a fence, and landscaping.
The project achieved Platinum Green Point Rating.